Completed projects - Hydraulic engineering construction
Home >> Completed projects >> Hydraulic engineering construction
HPP MEZDRA
Design, delivery and installation of waterproofing system over the Mezdra hydropower canal
more...
Design, delivery and installation of waterproofing system over the Mezdra hydropower canal
more...
Waterproofing of Aleko reservoir – engineering
Repair works on the inner face of the compensating basin. Construction of protective watertight PVC screen. Implementation of sediments cleaning system of the basin. The project has been completed for three months within the period November 2008 – May 2009.
more...
Repair works on the inner face of the compensating basin. Construction of protective watertight PVC screen. Implementation of sediments cleaning system of the basin. The project has been completed for three months within the period November 2008 – May 2009.
more...
Research, design and maintenance of Canal “Srebarna - Ginski” from Petrohan Cascade
Repair and rehabilitation works on the derivation canal Srebarna – Ginski, including replacement of existing concrete pipes by glass-fiber plastic ones, repair of equipment on the canal track and construction of operating road.
more...
Overhaul of daily reservoir “Vidima” – engineering
Repair of the basin bottom and slopes. Laying synthetic isolation coverage – PVC geomembrane. Building and commissioning of leveling system. Project has been implemented in year 2008.
more...
Restoration of water-tightness of the upstream face at Kalin dam, Blagoevgrad dam district
Delivery and mounting of the geomembrane coverage for Kalin concrete dam upstream face water-tightness – National park Rila. The project has been done in year 2007.
more...
Delivery and mounting of the geomembrane coverage for Kalin concrete dam upstream face water-tightness – National park Rila. The project has been done in year 2007.
more...